Upper Mills Bridge

Contract for bridge build placed with Cheltenham-based Britannia Construction - 8 June 2010

PDFPDF Update from Stroud District Council June 2010

Planning Permission Granted 23 November 2009

Planning Application Details On-Line - August 2009

Link to Click Here to go toClick Here to go to - the Upper Mills Planning application details

Plans go in for approval - Mid June 2009

During the last few month the site has been surveyed and an outline design drawn up by M.D.Hughes and Partners, who are base in Stonehouse. A planning application was submitted in mid June to Stroud District Council for approval. At the same time discussions have taken place with several contractors who are interested in tendering to carryout the design work and construction. Below are extracts from the drawings that are currently being condisered.

An artist's impression of the proposed bridge
An artist's impression of the proposed bridge
Upper Mills Plan
Upper Mills Plan

PDFPDF For full plan click Here

Upper Mills
Upper Mills

PDFPDF For Full sectional drawings click here

Drilling Rig on site - Early March 2009

Is there Oil??
Is there Oil??

Test bores are now being carried out to establish the ground conditions in the area of the new bridge and its canal approaches. This is fairly standard exploration work that needs to be carried out before a detailed design and costing of the work can take place. These tests have shown, at first look, that a fairly solid layer of undisturbed material starts at approximately the level of the new canal bed. Futher tests offsite will be caried out to show the strength of the material and its water sealing ability.

Just a good solid bed material!!
Just a good solid bed material!!

Site preparation work begins - Winter 2008/09

Clearance work has been taking place at the site of Upper Mills bridge over the winter months prior to the spring nesting session.
Plans are now being drawn up and negotiations with the landowners are underway to replace the former swing bridge, which has been fixed for some years, with a new high level bridge.
It is hoped that work can be carried out to build the new bridge later this year.

Looking west from the bridge after the clearance at the end of February 2009
Looking west from the bridge after the clearance at the end of February 2009
Looking east from the bridge after the clearnce in February 2009
Looking east from the bridge after the clearnce in February 2009
Makers plate on the remains of the original swing bridge
Makers plate on the remains of the original swing bridge
Upper Mills bridge looking west during the Summer 2008
Upper Mills bridge looking west during the Summer 2008
-