WRG New Year camp clears bed upstream - January 2012
| The winding hole just above Inglesham Lock clear for the first time in many years |
|---|
| The canal head west beyond the Winding Hole |
|---|
| Another tree logged up by the chainsaw gang |
|---|
| One of the bonfires along the way |
|---|
WRG Summer Camps working on the head of the lock - August 2011
![]() | |
| Top wing wall taken back to something solid!! |
|---|
![]() | |
| Top paddle hole on the towpath side |
|---|
![]() | |
| Bywash culvert on the towpath side with bricjwork stripped back |
|---|
London WRG at work on site - End of February 2011
![]() | |
| Tree stump removal |
|---|
![]() | |
| Clearing the silt build-up from the head of the lock |
|---|
Tree clearance underway on a cold snowy winter's day - December 2010
| Trees felled where the new landing stage will be constructed |
|---|
| West Face of the bridge now visible |
|---|
| Tree surgeon inserts an endoscope into a hole to check there is no resident wildlife - There wasn't |
|---|
| Trees along the lockside felled ready for clearing |
|---|
| Lock side cut and mostly cleared |
|---|
26th June 2010 - IWA Launches Tom Rolt Appeal to Fund Inglesham Lock Restoration
Emerging from the Undergrowth - September 2009
British Waterways have recently given the Cotswold Canals Trust volunteers pemission to clear the area round Inglesham Lock and Bridge. It is hoped that furthe work can be carried out in the not too distant fuure that will see the lock brought back to life and eventually restored to full working order.
| Looking from the bridge along the length of the lock before clearance |
|---|
| The same view as above after a day's work |
|---|
| For the lockside looking across the lock |
|---|
Click here for - Inglesham Lock Appeal